Skip to main content

Projects

The projects we've been dedicated to

Content card grid

wind
Przykona
The Przykona photovoltaic farm is of the largest PV farms in the CCE region and first such large farm on a post-mining site, it has the potential to become the largest photovoltaic power plant in Central and Eastern EU and one of the largest in EU.
Read more
Konary
Konary photovoltaic farm with a capacity of 45 MW, is the first hybrid facility in Poland. It used the same receiving station as the adjacent 79.5 MW Pavlovo wind farm, also of EDPR. The total connected load of the station did not change.
Read more
Margonin
Margonin Wind farm was the first project in Poland and it remains the biggest asset currently operating here, consisting of 60 turbines of total power of 120MW, enough to satisfy the energy needs of 100,000 households within a year.
Read more

Tax strategy

Explore this document to gain insights into our tax strategy, compliance processes, and detailed information on the company's financial and operational transparency in Poland.
1742992620
Carbon impact evaluator
This web page produces:
per Byte
0.000
g CO2
per Visit
0.000
g CO2