
Ribafeita Hydro Power Plant
The Ribafeita Hydro Power Plant, located in Pindelo dos Milagres, started operating in 1907.
Technical Information
- Start of Operations: 1907
- Installed Power: 0,9 MW
- Water Course: Vouga
- Average Annual Production: 4,8 GWh
- Location (GPS Coordinates): 40°45'42''N, 7°58'40''W
- Group Type: Simple
- Total Storage: 0,1 hm³
1744287956